- Go to Jobs -> Dispatch,
- Double click on the job that you want to multi book.
- On the top panel select Multibook.
- Click on a day that you would like add the job to the schedule. If you want to add more than one day Shift+Click on the last day or drag the mouse to it and all the dates will be added automatically. The maximum period is up to a week.
- Confirm each required date is listed on the right hand grid.
- If you need to remove a date double click on the date to remove it from the list or click the X at the end of the line.
- Select Close to close the window and return to the job entry screen.
- You can then Save the job which will save all additional dates.
Comments
0 comments
Article is closed for comments.